Table of Contents
Motorola Restoration Project
Equipment Donated by Motorola
DISASSEMBLYRemoval of unneeded parts
Inventory: Robot, End Defector, Teach Pendant
Fuse Box, Air Regulator, Pneumatic Cylinder, Proximity Sensor
Conveyor Belts & Gages
Adept Controller & Electrical Distributional Panel
Economic Analysis
PPT Slide
Operation 1: Incoming Parts Conveyor
Operation 2: Height test
Operation 3: Width test
Operation 4: Length test
Final Destinations
Operation Specifications
Application Information Manager (AIM)
AIM
CONCLUSION
|
Author: CEET NIU
|